Double Corrosion Ground Anchorage System, UJVNL
WORK: SLOPE STABILIZATION/ TOE STABILITY PROTECTION PRODUCTS: Double Corrosion Protection Passive Cable Anchors Introduction A 192m high Lakhwad Dam with its 900MW underground power station and 86m high Vyasi Dam situated 5km downstream of the Lakhwad with its 120MW power station at Hathiyari. Our project site was located at the Hathiyari Powerhouse station. The…